TABLE OF CONTENTS
Purpose of the Manual
Project Background
Project Scope and Programme
Project Description
Environmental Parameters to be Monitored
Project Organisation
Structure of the Report
Introduction
Air Quality Parameters
Monitoring Equipment
Laboratory Measurement / Analysis
Monitoring Locations
Baseline Monitoring
Impact Monitoring
Environmental Quality Performance Limits
Event and Action Plan
Mitigation Measures
Introduction
Noise Parameters
Monitoring Equipment
Monitoring Locations
Baseline Monitoring
Impact Monitoring
Event and Action Plan
Mitigation Measures
Introduction
Water Quality Monitoring under
Water Quality Monitoring for Temporary Sewage Bypass / Emergency Discharge
Monitoring Equipment
Sample Containers and Storage
Site Record
Laboratory Measurement / Analysis
Construction Site Audits
Mitigation Measures
5 HUMAN
HEALTH RISK ASSESSMENT
Introduction
Effluent Contamination Concentration Monitoring
Seawater Contaminant Concentration Monitoring
Statistical Analysis of Monitoring Data
Human Health Risk Assessment
Introduction
Contaminant Concentration Monitoring Programme
Whole Effluent Toxicity Test
7 WASTE
MANAGEMENT IMPLICATIONS
Introduction
Waste Control and Mitigation Measures
Introduction
Monitoring and Audit Requirements
Introduction
Mitigation Measures
Coral Monitoring Requirements
11 LANDSCAPE
AND VISUAL IMPACTS ASSESSMENT
Introduction
Baseline Monitoring
Event and Action Plan
Mitigation Measures
Introduction
Mitigation Measures
Introduction
Mitigation Measures
Site Inspections
Compliance with Legal and Contractual Requirements
Environmental Complaints
General
Baseline Monitoring Report
Monthly EM&A Reports (During Construction)
Operation Phase EM&A Reporting
Reporting for Post-Translocation Monitoring of Coral
Data Keeping
Interim Notifications of Environmenal Quality Limit Exceedances
List of
Tables
Table
2.1 Construction
Dust Monitoring Locations
Table
2.2 Operation
Odour Monitoring Locations
Table
2.3 Action
/ Limit Levels for Air Quality
Table
2.4 Event
/ Action Plan for Construction Air Quality
Table
2.5 Event
/ Action Plan for Operation Air Quality Monitoring
Table
3.1 Construction
Noise Monitoring Stations
Table
3.2 Action
and Limit Levels for Construction Noise
Table
3.3 Event
/ Action Plan for Construction Noise
Table
4.1 Discharge
Limits for TRC and CBPs
Table
4.2 Proposed
Marine Water Quality Monitoring Stations Close to SCISTW Outfall
Table
4.3 Proposed
Marine Water Quality Monitoring Stations in the Far Field Area
Table
Table
4.4 Proposed
Marine Water Quality Monitoirng Stations for Emergency Situations
Table
4.5 Emergency
Response Plan for Temporary Sewage Bypass and Emergency Discharge from HATS
Table
4.6 Suggested
Analytical Methods and Detection Limit
Table
5.1 List
of Contaminants and Analytical Methods to be Applied
Table
6.1 Analytical
Method and Detection Limit for Ammonia, Sulphide, Suspended Solids and TRC
Table
6.2 List
of Contaminants and Analytical Methods to be Applied
Table
6.3 Target
Toxicity Levels of SCISTW Effluent
Table
11.1...... Event and Action Plan
for Landscape and Visual Impact - Construction Phase
Table
11.2...... Proposed Landscape
Mitigation Measures for Construction Phase
Table
11.3...... Proposed Landscape
Mitigation Measures for Operation Phase
Figure 1.1 General
Layout plan of HATS Stage 2A
Figure 1.2 Proposed
Layout for SCISTW Upgrading
Figure 1.3 Tentative
Construction Programme
Figure 1.4 Project
Organization – EM&A Programme for Construction Phase
Figure 1.5 Project
Organization – EM&A Programme for Operation Phase
Figure 2.1a Locations
of Representative Air Sensitive Receivers – North Point PTW
Figure 2.1b Locations
of Representative Air Sensitive Receivers – Wan Chai East PTW
Figure 2.1c Locations
of Representative Air Sensitive Receivers – Central PTW
Figure 2.1e Locations
of Representative Air Sensitive Receivers – Sandy Bay PTW
Figure 2.1f Locations
of Representative Air Sensitive Receivers – Cyberport PTW
Figure 2.1g Locations
of Representative Air Sensitive Receivers – Wah Fu PTW and Aberdeen PTW
Figure 2.1h Locations
of Representative Air Sensitive Receivers – Ap Lei Chau PTW
Figure 2.2a Proposed
Dust Monitoring Locations During Construction Phase – North Point PTW
Figure 2.2b Proposed
Dust Monitoring Locations During Construction Phase – Wan Chai East PTW
Figure 2.2c Proposed
Dust Monitoring Locations During Construction Phase – Central PTW
Figure 2.2d Proposed
Dust Monitoring Locations During Construction Phase – Fung Mat Road Site
Figure 2.2e Proposed
Dust Monitoring Locations During Construction Phase – Cyberport PTW
Figure 2.3a Proposed
Odour Monitoring Location During Operation Phase – North Point PTW
Figure 2.3b Proposed
Odour Monitoring Location During Operation Phase – Wan Chai East PTW
Figure 2.3c Proposed
Odour Monitoring Location During Operation Phase – Central PTW
Figure 2.3d Proposed
Odour Monitoring Location During Operation Phase – Fung Mat Road Site
Figure 2.3e Proposed
Odour Monitoring Location During Operation Phase – Sandy Bay PTW
Figure 2.3f Proposed Odour Monitoring Location During Operation Phase – Cyberport PTW
Figure 2.3g Proposed
Odour Monitoring Location During Operation Phase – Wah Fu PTW and Aberdeen PTW
Figure 2.3h Proposed
Odour Monitoring Location During Operation Phase – Ap Lei Chau PTW
Figure 3.1a Location
of Construction Noise Monitoring Station – North Point PTW
Figure 3.1b Location
of Construction Noise Monitoring Station – Wan Chai East PTW
Figure 3.1c Location
of Construction Noise Monitoring Stations – Central PTW and Fung Mat Road Site
Figure 3.1d Location
of Construction Noise Monitoring Station – Sandy Bay PTW
Figure 3.1e Location
of Construction Noise Monitoring Station – Cyberport PTW
Figure 3.1f Location
of Construction Noise Monitoring Station – Wah Fu PTW and Aberdeen PTW
Figure 3.1g Location
of Construction Noise Monitoring Stations – Ap Lei Chau PTW
Figure 4.1 Proposed
Water Quality Monitoring Stations (Sheet 1 of 2)
Figure 4.2 Proposed
Water Quality Monitoring Stations (Sheet 2 of 2)
Figure 9.1 Locations
of Corals Recorded at Aberdeen PTW
Figure 14.1 Environmental
Complaint Flow Diagram
Appendix A Implementation
Schedule of Proposed Mitigation Measures
Appendix B Sample Data
Sheets for Air, Noise and Water Monitoring
Appendix C Sample
Template for the Interim Notification
Appendix
D Methodology
for Human Health Risk Assessment
Appendix
E Full
Report on Coral Survey at Aberdeen PTW